Archives

Tag: Chp Replacement

Government responds to FIT consultation & fails to act on replacement generating equipment

Locked!

*Members Only*

During the summer the Department for Business, Energy and Industrial Strategy (BEIS) consulted on the closure of the Feed-in Tariff and administrative measures. The government response to this consultation has today been published. You can access the full text of the response here. Government has considered the comments and…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, food waste operators, crop operators, FIT, feed-in tariff, fit closure, chp replacement, beis, emiliano lewis, thom koller

Read more

Ofgem firm up RHI rules on replacement plant

Locked!

*Members Only*

Following consultation by BEIS last year on replacement plant under the RHI, Ofgem has updated its system to allow this as of 1 October 2018. You can read the government response to the consultation here. The response to the consultation provides limited guidance on the process for replacement, besides stating that replacement…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, biomethane, food waste operators, crop operators, RHI, renewable financial incentives, beis, Ofgem, chp replacement, rhi budget cap, thom koller

Read more

ADBA responds to FIT consultation on closure of the scheme and CHP replacement

Locked!

*Members Only*

Over the last two months, the Department for Business, Energy and Industrial Strategy (BEIS) has been running an open consultation on the closure of the FITs scheme to new applicants on 31 March 2019, as well as seeking views on proposed scheme administrative changes. The consultation closed today…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, biomethane, FIT, beis, Ofgem, fit consultation, chp replacement, fit closure, emiliano lewis, ad chp, UK AD & Biogas

Read more

ADBA call for data - CHP replacement and biogas/biomethane load factors

Locked!

*Members Only*

FIT consultation - CHP replacement Government is consulting on replacement of generating equipment under the FIT as part of a consultation that runs until 13 September. You can read our summary of this consultation here. Before reaching a final decision on whether to consult in detail on replacing different pieces of…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, biomethane, UK AD & Biogas, FIT, chp replacement, RHI, RHI degression, estimated spend, load factors, production factors, emiliano lewis

Read more

BEIS launch long-awaited FIT consultation: 31 March 2019 scheme closure, CHP replacement

Locked!

*Members Only*

BEIS have today launched their long-awaited FIT consultation officially titled “CONSULTATION ON THE FEED-IN TARIFFS SCHEME”. The consultation runs until 13 September 2018 and a summary of the consultation is set out below. (BEIS have also today launched a call for evidence on the future role for small-scale low-carbon…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, beis, FIT, UK AD & Biogas, fit closure, chp replacement, budget reconcilliation

Read more

CHP replacement update

Locked!

*Members Only*

During the last year, ADBA has sought clarification from Ofgem and BEIS on how they would interpret replacement of CHP installations under the FIT. Earlier this year, ADBA joined with other trade associations representing the other FIT technologies (the British Hydropower Association (BHA), the Renewable Energy Association (REA), RenewableUK, Scottish…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, food waste operators, crop operators, FIT, Ofgem, beis, consultation, chp replacement, unused capacity

Read more

Replacing CHP installations under the FIT

Locked!

*Members Only*

The vast majority of AD plants with CHP have commissioned since 2010, following the introduction of the FIT. As such, due to the high build quality of engines most AD plants would not have needed to replace their installations to date. This situation is changing. The lifespan of CHP installations used…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, crop operators, food waste operators, renewable financial incentives, FIT, chp replacement, Ofgem, beis, thom koller

Read more

CHP replacement under the FIT

Locked!

*Members Only*

During 2016 ADBA began discussions with Ofgem on the topic of CHP replacement under the FIT, something which the legislation is silent on. We understand that Ofgem is yet to encounter a ‘live’ instance of a plant requiring a replacement CHP and so has not had cause to formulate…

Posted in: News for Members, Policy updates

Tags: anaerobic digestion, biogas, crop operators, food waste operators, beis, Ofgem, consultation, Feed-in-Tariff, chp replacement, CHP, thom koller

Read more