Archives

Tag: Significant Code Review

What’s next for embedded benefit and residual charges?

Locked!

*Members Only*

Ofgem is currently reforming network charging, the effects of which look set to cut embedded benefit. As we informed ADBA Members last year, following consultation on CMP264 and CMP265 Ofgem produced a 'minded to' decision that they are pressing ahead (following the WACM4 recommendation). This works to remove the…

Posted in: Policy updates

Tags: anaerobic digestion, biogas, food waste operators, crop operators, Ofgem, targeted charging review, significant code review, consultation, riio-2, triad, embedded benefits, thom koller

Read more

Ofgem begin Significant Code Review

Locked!

*Members Only*

Following consultation earlier in the year Ofgem has decided to launch a Targeted Charging Review (TCR) Significant Code Review (SCR), which will: Consider reform of residual charging for transmission and distribution, for both generation and demand, to ensure it meets the interests of consumers, both now and in future; and …

Posted in: News for Members, Policy updates

Tags: anaerobic digestion, biogas, food waste operators, crop operators, renewable electricity, Ofgem, beis, greg clark, consultation, significant code review, triad payments, embedded benefit, tnuos, bsuos, cmp264, cmp265, network charging, thom koller

Read more